News

Green power and iconic charging at SKG-IKOB

Sept. 30, 2020

On the roof of SKG-IKOB's office and laboratory, 436 solar panels were installed this spring. With an expected annual yield of 126,500 kWh, the panels are going to provide much of the energy needed. 

News

BRL-en 9600-01, 06 and 07 published for criticism.

Sept. 29, 2020

The drafts of the assessment guidelines BRL 9600 parts 01, 06 and 07 of SKG-IKOB Certificatie BV / KIWA have been published for criticism (submitted for review).

News

Critically published BRL 1332-02 for the KOMO process certificate for thermal insulation the underside of roofs with sprayed PUR foam

Sept. 28, 2020

The draft assessment guideline (BRL) 1332-02 FOR THE KOMO-PROCESS CERTIFICATE FOR THERMIC ISOLING THE UNTERNAL SIDE OF GOODS WITH PUR-SPOTTED SHIELD of SKG-IKOB Certification BV has been published for criticism (submitted for review).

News

Critically published BRL 2114 reflective insulation systems for the thermal (post-) insulation of floors, facades and pitched roofs

Sept. 28, 2020

The draft of the assessment guideline (BRL) 2114-00 with accompanying part BRLs -01, -02, -03 and -55, REFLECTING ISOLATION SYSTEMS FOR THERMAL (NA-)ISOLING OF FLOORS, FRAMES, AND ROOFING OF SKG-IKOB CERTIFICATION BV has been published for criticism (submitted for review).

News

Chain approach to quality assurance in the plastic facade industry counts

Aug. 31, 2020

For many building products, the end result is a concatenation of the work of various companies; of the chain. For the quality of the end result, all links are important. To guarantee the level of quality, it counts that all links in the entire chain are aware of the importance of quality and its assurance. 

News

Accreditation scheme gives certainty on floor area measurement

June 22, 2020

Trade association Vm2 has introduced the new accreditation scheme 'Area measurements in accordance with NEN 2580 and NTA 2581'. This regulation contains additional quality requirements for preparing an unambiguous measurement report on the measurement of floor areas. It gives clients certainty that a measurement has been carried out correctly and prevents discussion afterwards. 

News

SKG-IKOB Laboratory expands with facilities for IP testing (dust and water)

May 11, 2020

Anyone who thinks testing and certification is dusty is right when it comes to (electromechanical) locks. Because dust is a threat to the functionality and durability of such locks and can cause the lock to no longer open or close. In addition, it is common knowledge that water and electricity do not mix well. 

News

Draft BRL 1518 "Pouring of concrete mortar at the construction site" published for comment

May 11, 2020

On May 8, 2020, SKG-IKOB Certificatie B.V. and Kiwa Nederland B.V. are publishing the draft of BRL 1518 "Pouring concrete mortar on the construction site" for comment. The comment period runs until June 19, 2020.

News

Certificate One and a Half Meter Office secures new work protocol

May 2, 2020

Move freely in 100% of the space in use, with at least one and a half meters around you. If it succeeds, an organization can apply for the new independent certificate One and a Half Meter Office. CFP Green Buildings and SKG-IKOB developed a recognition scheme for organizations that have arranged all workplaces and traffic areas taking into account 1.5 meters distance.